Energising projects – all over the world

Our list of domestic and international references is long. Yet no two projects are the same, with each one having its own unique rules and challenges.
Throughout the world, SCHNEPF develops innovative energy concepts at the highest level using renewable energy sources. Presented here are a selected number of projects that offer you an insight into our work.

 

Project description

Construction of an office and development building

Location

D – 72202 Nagold

Developer/principal

BIN Boysen Innovationszentrum Nagold GmbH & Co. KG

Historical cost of technical building services

EUR 8 million (net)

Implementation period

Planning mid-2013 – April 2014; implementation mid-2014 – end of 2014

Scope of performance

  • Sanitation including water treatment
  • Heating supply using waste heat regeneration from work processes
  • Cooling systems
  • Cooling water supply
  • Compressed air supply
  • Ventilation technology
  • Measurement and control technology and building management system

Project description

New construction of the production and administration building "Aesculap Innovation factory" (motor and container production for orthopaedic and surgical medical equipment)

Location

D - 78532 Tuttlingen

Developer/principal

Aesculap AG

Historical cost of technical building services

EUR 10.8 million (net)

Implementation period

Planning start of 2012 – mid-2013; implementation mid-2013 – mid-2014

Scope of performance

  • Sanitation including water and wastewater treatment and drinking water hygiene system
  • Media supply and disposal
  • Heating in the form of a 70/40°C district heating supply, with heat regeneration from cooling water and compressed air generation, 3 MW heating capacity.
  • Cooling in the form of a 9/15°C district cooling system, 2 MW cooling capacity
  • Building ventilation systems
  • Extraction systems
  • Measurement and control technology and building management system

Project description

New construction of "SUNRISE" production hall
Construction phase 1 – production line 1
(pharmaceutical production of infusion solutions)

Location

D – 12357 Berlin

Developer/principal

B.Braun Melsungen AG

Historical cost of technical building services

EUR 9.8 million (net)

Implementation period

Planning mid-2012 – mid-2014; implementation start of 2014 – mid-2015

Scope of performance

  • Sanitation including water and wastewater treatment for processes
  • Heating supply using waste heat from processing
  • Cooling systems
  • Ventilation technology
  • High-voltage and low-voltage power systems
  • Media technology
  • 2,000-kg goods lift
  • Steam supply
  • Cooling water supply
  • Compressed air supply
  • Sprinkler network connected to existing centralised sprinkler system
  • Measurement and control technology and building management system
  • Cleanroom monitoring system, including sluice control

Project description

New construction project "VIESSMANN TECHNIKUM"
(research and development centre for heat generators)

Location

D – 35107 Allendorf / Eder

Developer/principal

Viessmann Werke GmbH & Co. KG

Historical cost of technical building services

EUR 16.5 million (net)

Implementation period

Planning 2013 – 2014; implementation mid-2014 – mid-2017

Scope of performance

  • Sanitation including water treatment for processes
  • Heating using waste heat and local heating supply from own centralised heating system
  • Cooling systems
  • Cooling water supply
  • Ventilation technology
  • High-voltage and low-voltage power systems
  • Photovoltaic system
  • Media technology
  • Lifts: 1 x 2,500-kg goods lift; 2 x 1,000-kg passenger lifts
  • Supply of technical gases
  • Compressed air supply
  • Measurement and control technology and building management system